Which of the following is not a Choice to achieve reliable cost and effort estimation

Which of the following is not an option to achieve reliable cost and effort estimate?

Base estimates on similar projects that have already been completed

Use one or more empirical models for software cost and effort estimation

Use relatively simple decomposition techniques to generate project cost and effort estimates

The ability to translate the size estimate into human effort, calendar time, and dollars

Answer : D

Sponsored Ad

अगर आप कम्पटीशन एग्जाम की ऑनलाइन तैयारी कर रहे है तो यहाँ से आप फ्री में Online Test

View More Related Question

1) COCOMO was developed initially by

B.Beizer

Rajiv Gupta

B.W.Bohem

Gregg Rothermal

View Answer

2) What threatens the quality and timeliness of the software to be produced?

Known risks

Business risks

Project risks

Technical risks

View Answer

3) Which of the following strategies means that the impact of the risk will be reduced?

Avoidance strategies

Minimization strategies

Contingency plans

All of the mentioned

View Answer

4) What involves preparing software for external release and keeping track of the system versions that have been released for customer use?

System building

Release management

Change management

Version management

View Answer

5) Which of the following costs is not part of the total effort cost?

Costs of networking and communications

Costs of providing heating and lighting office space

Costs of lunch time food

Costs of support staff

View Answer

Software Management Mcqs

  • Home >> Category >> Software Engineering Mcqs >> Software Management Mcqs >> Which of the following is not an option to achieve reliable cost and effort estimate ?

  • « Previous
  • Next »


Q.  Which of the following is not an option to achieve reliable cost and effort estimate ?

a. Base estimates on similar projects that have already been completed

b. Use one or more empirical models for software cost and effort estimation

c. Use relatively simple decomposition techniques to generate project cost and effort estimates

d. The ability to translate the size estimate into human effort, calendar time, and dollars


MCQs:  ISO 9001 is not concerned with _______________ of quality records?

Category: Software Engineering Mcqs,   Published by: teswesm

MCQs:  CMM stands for_____________________?

Category: Software Engineering Mcqs,   Published by: teswesm

MCQs:  Who identifies, documents, and verifies that corrections have been made to the software ?

Category: Software Engineering Mcqs,   Published by: teswesm

MCQs:  Which of the following is not included in External failure costs ?

Category: Software Engineering Mcqs,   Published by: teswesm

MCQs:  Which requirements are the foundation from which quality is measured ?

Category: Software Engineering Mcqs,   Published by: teswesm

MCQs:  Degree to which design specifications are followed in manufacturing the product is called_________________?

Category: Software Engineering Mcqs,   Published by: teswesm

MCQs:  Which of the following is not included in failure costs ?

Category: Software Engineering Mcqs,   Published by: teswesm

MCQs:  The Capability Maturity Model (CMM) is a continuous model ?

Category: Software Engineering Mcqs,   Published by: teswesm

MCQs:  What is not included in prevention costs ?

Category: Software Engineering Mcqs,   Published by: teswesm

MCQs:  The ISO 9000 series of standards is a program that can be used for external quality assurance purposes ?

Category: Software Engineering Mcqs,   Published by: teswesm

MCQs:  CO policy in CMM means___________________?

Category: Software Engineering Mcqs,   Published by: teswesm

MCQs:  Which of the following is not a maturity level in CMM ?

Category: Software Engineering Mcqs,   Published by: teswesm

MCQs:  Which of the following requires design control measures, such as holding and recording design reviews and qualification tests ?

Category: Software Engineering Mcqs,   Published by: teswesm

MCQs:  ____________ states that, where appropriate, adequate statistical techniques are identified and used to verify the acceptability of process capability and product characteristics?

Category: Software Engineering Mcqs,   Published by: teswesm

MCQs:  Which of the following is not a SQA plan for a project ?

Category: Software Engineering Mcqs,   Published by: teswesm

MCQs:  The CMMI assessment is based on a x-point scale. What is the value of x ?

Category: Software Engineering Mcqs,   Published by: teswesm

MCQs:  It is always best to start process analysis with a new test model ?

Category: Software Engineering Mcqs,   Published by: teswesm

MCQs:  Which of the following is not a part of process change ?

Category: Software Engineering Mcqs,   Published by: teswesm

MCQs:  What is a tangible output of an activity that is predicted in a project plan ?

Category: Software Engineering Mcqs,   Published by: teswesm

MCQs:  Process improvement is the set of activities, methods, and transformations that developers use to develop and maintain information systems ?

Category: Software Engineering Mcqs,   Published by: teswesm

  • « Previous
  • Next »

Which of the following is not included in the total effort cost *?

Q.
Which of the following costs is not part of the total effort cost?
B.
costs of providing heating and lighting office space
C.
costs of lunch time food
D.
costs of support staff
Answer» c. costs of lunch time food
Which of the following costs is not part of the total effort cost? - McqMatemcqmate.com › discussion › which-of-the-following-costs-is-not-part-of-th...null

What is not an approach to software cost estimation?

1 Answer. For explanation: Critical is no such standard approach of cost estimation.

Which one of the following is not considered as a risk in project management Mcq?

Which of the following is not considered as a risk in project management? Explanation: Testing is a part of project, thus it can't be categorized as risk.

Which of the following is not an example of a business process?

Which of the following is not an example of a business process? Explanation: It is a part of development phase.