Which of the following is not an option to achieve reliable cost and effort estimate?
Base estimates on similar projects that have already been completed
Use one or more empirical models for software cost and effort estimation
Use relatively simple decomposition techniques to generate project cost and effort estimates
The ability to translate the size estimate into human effort, calendar time, and dollars
Answer : D
Sponsored Ad
अगर आप कम्पटीशन एग्जाम की ऑनलाइन तैयारी कर रहे है तो यहाँ से आप फ्री में Online Test
View More Related Question
1] COCOMO was developed initially by
B.Beizer
Rajiv Gupta
B.W.Bohem
Gregg Rothermal
View Answer
2] What threatens the quality and timeliness of the software to be produced?
Known risks
Business risks
Project risks
Technical risks
View Answer
3] Which of the following strategies means that the impact of the risk will be reduced?
Avoidance strategies
Minimization strategies
Contingency plans
All of the mentioned
View Answer
4] What involves preparing software for external release and keeping track of the system versions that have been released for customer use?
System building
Release management
Change management
Version management
View Answer
5] Which of the following costs is not part of the total effort cost?
Costs of networking and communications
Costs of providing heating and lighting office space
Costs of lunch time food
Costs of support staff
View Answer
Software Management Mcqs
- Home >> Category >> Software Engineering Mcqs >> Software Management Mcqs >> Which of the following is not an option to achieve reliable cost and effort estimate ?
- « Previous
- Next »
Q. Which of the following is not an option to achieve reliable cost and effort estimate ?
a. Base estimates on similar projects that have already been completed
b. Use one or more empirical models for software cost and effort estimation
c. Use relatively simple decomposition techniques to generate project cost and effort estimates
d. The ability to translate the size estimate into human effort, calendar time, and dollars
MCQs: ISO 9001 is not concerned with _______________ of quality records? Category: Software Engineering Mcqs, Published by: teswesm |
MCQs: CMM stands for_____________________? Category: Software Engineering Mcqs, Published by: teswesm |
MCQs: Who identifies, documents, and verifies that corrections have been made to the software ? Category: Software Engineering Mcqs, Published by: teswesm |
MCQs: Which of the following is not included in External failure costs ? Category: Software Engineering Mcqs, Published by: teswesm |
MCQs: Which requirements are the foundation from which quality is measured ? Category: Software Engineering Mcqs, Published by: teswesm |
MCQs: Degree to which design specifications are followed in manufacturing the product is
called_________________? Category: Software Engineering Mcqs, Published by: teswesm |
MCQs: Which of the following is not included in failure costs ? Category: Software Engineering Mcqs, Published by: teswesm |
MCQs: The Capability Maturity Model [CMM] is a continuous model ? Category: Software Engineering Mcqs, Published by: teswesm |
MCQs: What is not included in prevention costs ? Category: Software Engineering Mcqs, Published by: teswesm |
MCQs: The ISO 9000 series of standards is a program that can be used for external quality
assurance purposes ? Category: Software Engineering Mcqs, Published by: teswesm |
MCQs: CO policy in CMM means___________________? Category: Software Engineering Mcqs, Published by: teswesm |
MCQs: Which of the following is not a maturity level in CMM ? Category: Software Engineering Mcqs, Published by: teswesm |
MCQs: Which of the following requires design control measures, such as
holding and recording design reviews and qualification tests ? Category: Software Engineering Mcqs, Published by: teswesm |
MCQs: ____________
states that, where appropriate, adequate statistical techniques are identified and used to verify the acceptability of process capability and product characteristics? Category: Software Engineering Mcqs, Published by: teswesm |
MCQs: Which of the following is not a SQA plan for a project ? Category: Software Engineering Mcqs, Published by: teswesm |
MCQs: The CMMI assessment is based on a x-point scale. What is the value of x ? Category: Software Engineering Mcqs, Published by: teswesm |
MCQs: It is always best to start process analysis with a new test model ? Category: Software Engineering Mcqs, Published by: teswesm |
MCQs: Which of the following is not a part of process change ? Category: Software Engineering Mcqs, Published by: teswesm |
MCQs: What is a tangible output of an activity that is predicted in a project plan ? Category: Software Engineering Mcqs, Published by: teswesm |
MCQs: Process improvement is the set of activities, methods,
and transformations that developers use to develop and maintain information systems ? Category: Software Engineering Mcqs, Published by: teswesm |
- « Previous
- Next »
Which of the following is not included in the total effort cost *?
Q. | Which of the following costs is not part of the total effort cost? |
B. | costs of providing heating and lighting office space |
C. | costs of lunch time food |
D. | costs of support staff |
Answer» c. costs of lunch time food |